status of sponge iron plant orissa

Home - SMC Power Generation Ltd

SMC Power Generation Limited was incorporated in the year 2000 and entered into memorandum of understanding with the Government of Orissa to establish an integrated steel plant. The Company has established their plant with capacities of Sponge Iron 2,00,000 MTPA, Billet 3,50,000 MTPA, TMT 2,50,000 MTPA & Power 33 MW.

Learn More
Sponge Iron in Gandhidham, स्पंज आयरन, गांधीधाम, Gujarat

Business listings of Sponge Iron manufacturers, suppliers and exporters in Gandhidham, स्पंज आयरन विक्रेता, गांधीधाम, Gujarat along with their contact details & address. Find here Sponge Iron, suppliers, manufacturers, wholesalers, traders with Sponge Iron prices for buying.

Learn More
Dhruba Swain - HR Manager - Orissa Sponge Iron & Steel Ltd

View Dhruba Swain's profile on , the world's largest professional community. Dhruba has 1 job listed on their profile. See the complete profile on 

Learn More
Sri Ganesh Sponge Iron Pvt Ltd - Manufacturing Of Sponge

Sri Ganesh Sponge Iron Pvt Ltd has filed an industrial Entreprenuers Memorandum for setting up a new project for Manufacturing Of Sponge Iron. The location of the unit would be Keonjhar in Orissa. The memorandum was filed on March 26, 2009.

Learn More
ORISSA SPONGE IRON AND STEEL LTD

OSIL has signed an MOU with the Government of Orissa for setting up of a 1 million ton steel plant . OSIL has been allotted an iron ore mines containing sufficient reserve of high grade ore in 2004 at a distance of 35 kms from its plant site to take care of its present and future ore requirements. OSIL has also been allotted a coal block at New

Learn More
PDF Physico-chemical Characterization of Sponge Iron Solid

Sponge iron is a metallic product obtained by reduction of iron oxide in solid state, which is used for manufacturing steel. Steel is manufactured from iron ore mostly using blast furnace (BF) and basic oxygen furnace (BOF) and using electric arc furnace (EAF) in case of manufactured from scrap materials.

Learn More
Home [www.mspsteel.com

The Company has manufacturing facilities for production of Pellet, MS Billets, TMT Bars ,Sponge Iron , Structural Products and Power. Raw material is locally procured and also imported. In today's challenging and competitive environment, strategies for mitigating inherent risks in accomplishing the growth plans of the Company are imperative.

Learn More
Krishna Iron Steel & Power Pvt. Ltd

For DRI (Sponge iron) Iron Ore 144000 Barbil, Orissa NMDC, Chhattisgarh By Rail & by Road Coal 117000 SECL Chhattisgarh / MCL Orissa / Imported Coal By Rail & by Road Dolomite 4500 Raipur / Durg By Road (Covered trucks) For Induction Furnace (MS billets ) Sponge Iron 90000 In plant

Learn More
Orissa State Pollution Control Board - India Environment

Public hearing for expansion of existing sponge iron plant at Keonjhar. The public hearing in respect of expansion project proposed by M/s Crackers India (Alloys) Ltd for expansion of existing sponge iron plant of 60,000 TPA to Integrated Steel Plant of 1.0 MTPA and CPP (WHRB 32 MW + AFBC 22 MW) of 54 MW at Gobardhanpur in the district of Keonjhar was held on scheduled date & time at Bhagalpur

Learn More
Orissa Minerals Development Company Company History

The equity shares of the company were listed on the National Stock Exchange Ltd with effect from September 29 2010.The company plans to install 2 MTPA Pelletizing Plant with 2 million tonne iron ore beneficiation facilities at Thakurani Orissa. Also they are in the process of expanding their existing 30000 TPA Sponge Iron Plant at Thakurani Orissa.

Learn More
Best TMT Bar in India | TMT Bar Company in India

Connect with us. Jai Balaji Industries Ltd. 5, Bentinck Street Kolkata - 700 001. Phone: +91 33 2248 9808. Fax: +91 33 2243 0021. [email protected]

Learn More
CPCB | Central Pollution Control Board

1. Air Pollution. Guidelines of setting up of Petrol Pumps. 10-01-2020. AQM. 2.03 MB. 2. Chemicals. Compilation of MSDS for the 708+ Hazardous, Toxic and/or Flammable Chemicals.

Learn More
Orissa Minerals - Share/Stock Price Live Today, NSE/BSE

The company plans to install 2 MTPA Pelletizing Plant with 2 million tonne iron ore beneficiation facilities at Thakurani, Orissa. Also, they are in the process of expanding their existing 30000 TPA Sponge Iron Plant at Thakurani, Orissa.

Learn More
Orissa Power Plants - Industry Focus

a detailed list of upcoming new thermal power plants in Orissa state, along with project promoters, capacity, location etc.,

Learn More
OMDC Current Tenders - Mining - Iron, Manganese, Sponge

Quantitative & qualitative assessment of Iron Ore & Manganese Ore lying at different Mines ,raw materials & products of sponge Iron of sponge Iron plant annually(i.e 31st March) and Qualitative despatch of material whenever required of The OMDC Ltd, AT/PO- THAKURANI, VIA- BARBIL-758035, DIST- KEONJHAR, (ODISHA) .

Learn More
Sponge iron(y) - Down To Earth

The status as on September 16, 2003: around 22 proposals pending with the Orissa Pollution Control Board (OPCB), and 26 plants already functioning. The industry 

Learn More
Orissa Sponge Iron & Steel Share Price Live Today - LKP Securities

Get today's Orissa Sponge Iron & Steel Ltd. share price details along with futures & options quotes. Get detailed report in terms of MF holding details, 

Learn More
Contact Us - Reliable Sponge Pvt. Ltd

M/s. Reliable Sponge Pvt. Ltd. Head Office Address: YYY-6, Civil Township, Rourkela, Odisha - 769012 Email: [email protected] Mobile: +91 9437965857

Learn More
PDF Government of Orissa Industries Department

The Industrial Policy of Orissa, 1992 has been formulated in this background and keeping in mind the State's unique assets as well as special problems. The State has vast mineral resources - Iron ore, Manganese Ore, Chromite, Coal. Bauxite, Gemstones and Granite used for decorative purposes - to mention only a few.

Learn More
SteelWorld.com - Monthly Journal

SPS Sponge Iron Ltd., a SPS group company, will set up a sponge iron unit in Orissa. The state, one of the most emerging coastal hubs in India, will see a sponge iron and steel making facility soon. The plant will be set up at Jharsuguda by SPS Sponge Iron Ltd., a SPS group company, all set to go for renaming as SPS Steel & Power Ltd. at an

Learn More
Aryan Ispat & Power Pvt Ltd

Aryan Ispat & Power (P) Ltd. was commenced with projected capital outlay of Rs.393.14 crore as per the memorandum of Understanding signed with Government of Orissa to produce 0.26 MTPA of Sponge Iron, 0.10 MTPA Pig Iron ,0.30 MTPA of Steel Billets and 45 MW of power generation.

Learn More
Tata Group - Wikipedia

Tata Group is an Indian multinational conglomerate manufacturer of automobiles, airplanes and other products, headquartered in Mumbai, Maharashtra, India.Founded in 1868 by Jamshedji Tata, the company gained international recognition after purchasing several global companies.It is one of the biggest and oldest industrial groups in India. Each Tata company operates independently under the

Learn More
Status of End use projects linke

EUPs where substantial Investment made/committed and order for main plant equipment placed Status of end use project linked to category 'A Blocks (B) Projects for which status obtained during Meeting in CEA on 12.07.2010 and subsequently including New UMPPs

Learn More
PPT PowerPoint Presentation

The plant at Kalinganagar has an annual production capacity of 225,000 tonnes of pig iron, 400,000 tonnes of coke, 50,000 tonnes of ferro-chrome and 300,000 tonnes of sponge iron. The other plant is in Golagaon, with a chrome-ore beneficiation and grinding plant, each with a capacity of 100,000 tonnes per annum.

Learn More
Orissa Sponge Iron & Steel Ltd. Accounting Policies

1. CORPORATE IN FORMATIONS a. Orissa Sponge Iron & Steel Limited was incorporated in the year 1979. The Company established manufacturing facilities to produce Sponge Iron, Steel

Learn More
Greenfield projects manufacturing india status

State govt asking company to acquire pvt. Land directly. Capacity to be achieved by FY 2016 Essar Steel - Paradeep Steel plant Orissa 6.0 MTPA Out of 1822 acres, 456 acres of private land has been acquired and 812 acres of private land is under acquisition. Project implemented time - 36 months from the date of LA.

Learn More

Leave a comment